L42#507

L42#507

Welcome to your dedicated webpage. From here you will be able to follow the progress of the delivery, track the  boat and receive updates from the captain and operations desk.

 

Downloads

Here you be able to download any relevant documents.

Notes

Here you will see updates on progress from the captain and our operations desk.


10th January 2020: Captain reports. When turning on engine this morning the port side propeller was lost. They have not reported hitting anything underwater.


02nd January 2020: Captain reports

We’ve had a piece of net in our portside propeller.  We’ve  dived once, in the sea, before arriving here but there was a piece still that we could not take away. We’ve retried here in the marina but we still can’t take it away. The temperature  of the water is 14°.

Impossible to go through until Gibraltar with just one engine. We’re now in Barbate. We’ve contacted a diver here. He’s coming this afternoon at 5pm. We’re leaving tomorrow early.


20th December 2019; Captain reports:

Update lagoon 42:

  1. Autopilot disengaged 7 times in 2 days. There’s no update available so I don’t know where the problem comes from.

  2. Important chafe on the second reef (see photo) in the output of the boom.

  3. Aft portside shower doesn’t pomp pump water completely.


18th December 2019: Captain reports:

Nick, we’ve tried to get to Ribadeo (between  Gijon and La Coruña) but we’ve just turned to go back to Gijon. At 8am we had 4knts, and now 40. Trop difficult to enter in Ribadeo because is in a “ría” and the swell is very short. It’s not good for the boat and the mast. ETA at 7 pm more or less.


16th December 2019: Departed Les Sables


12th December 2019: Crew on board


 

 

Gallery

Here you will see links to photo and videos of the delivery.






 


Translate »