L450f#551 Between the Sheets Again

Welcome to your dedicated yacht delivery page.

  • View live position reports
  • See photos
  • Read updates from the Captain and Operations.

Our tracking systems are available to buy from our on line store.


Photo Galleries

 Pre Launch   Paperwork 

Narrative

03rd Nov 2016; Arrived Hodges Creek

03rd Nov 2016; Arrived Virgin Gorda

20th Oct 2016; Departed Cape Verde, ETA BVI 5th November

19th Oct 2016; Captain reports;

Waterline scrubbed. Fuel up tomorrow and depart.

19th Oct 2016; Arrived Cape Verde. No problems reported.

14th Oct 2016; Departed Canaries. ETA Cape Verde 19th Oct

13th Oct 2016; Captain Reports

Strong winds associated with depression NW of canaries. Cant get off the berth without being blown onto other boat. Ready to leave but if I try there is a good chance i will cause damage.

09th Oct 2016; Arrived Canaries. No problems reported

04th Oct 2016; Departed Cascais. ETA Canaries 8th Oct

03rd Oct 2016; Engine service completed this afternoon. Plan to depart in the morning

02nd Oct 2016; Arrived Cascais

29th Sept 2016; Heading into La Coruna to remove line around port prop

27th Sept 2016; Departed Les Sables d’Olonne

26th Sept 2016; Captain reports.

1.STBD AFT CABIN HOLDING TANK OUTLET VALVE LEAKING. BOAT PUT ONTO SLIP AND VALVE REPLACED. NEW UNDER HULL VALVE FITTING WAS ANTIFOULED

2.STBD AFT CABIN TAP FITTINGS LEAKING. FITTINGS REPLACED WITH NEW

3. DRILL HOLE TO DECK BY FORWARD PORT COCKPIT WELL. HOLE FILLED AND MADE GOOD

23rd Sept 2016; Seacock replaced. Tap (faucet) in aft cabin was leaking. Technician took apart and found faulty part. This will not be replaced before Monday

21st Sept 2016; Launched and being cleaned prior to handover at 1400. Captain reports;

We have discovered  stbd holding tank seacock is leaking. The boat will be hauled out for repair tomorrow morning.

The crew will be on board tonight.

20th Sept 2016; Captain reports;

Unable to launch L450#551 today due to lack of SAS personnel. L42#28 is parked in front of L450#551 and will need to be launched first.

19th Sept 2016; Handover delayed. Vincent advised us that Handover was changed to the 22nd. However the captain has a good working relationship with guys on the dock and agreed Handover for tomorrow afternoon. CNB will not have time to clean the boat but the Captain has agreed to do that to get on board earlier.

The boat will be launched tomorrow and fingers crossed there’s not too many technical problems.