L450#845
Welcome to your dedicated webpage. From here you will be able to follow the progress of the delivery, track the boat and receive updates from the captain and operations desk.
Downloads
Here you be able to download any relevant documents.
Notes
16th March 2020: Public places closing including marina. Visitors required to leave including crew whilst flights available. Delivery stopped
12th March 2020: In Cascais
- Diver removed fishing line from prop
- Engine service being done
- Captain notes; the Genoa furling was installed the wrong way (see photos) so the UV strip was inside when furled. Now fixed. Halyard was also wrapped around the forestay making it difficult to furl. Now unwrapped.
08th March 2020; Captain reports
I’m on fuel dock Gijon. 40kts and 6-8m breaking seas trying to pass Gijon. Sleep is nice! Will fuel and leave am.
07th March 2020; Departed again
03rd March 2020: Now returning to port.
Captain reports 8m short seas.
Forecast is
WIND; In north, variable 3 or 4, becoming southwesterly 5 or 6 later. In south, cyclonic 7 to severe gale 9, becoming westerly or southwesterly 4 to 6.
SEA STATE; In north, rough. in south, rough or very rough.
WEATHER; In north, occasional rain. In south, rain at times.
VISIBILITY; In north, moderate or good. In south, good, occasionally poor.
03rd March 2020; They are departing Les sables
02nd March 2020; Captain reports;
CNB were still working on the boat on Friday fixing the anchor windlass. Could not leave before. Weather permitting, we will depart tomorrow.
23th February 2020: Captain on board
Gallery
-
L450#845 Cascais 2See images »
-
L450#845 Les SablesSee images »
-
L450#845 CascaisSee images »