L450#845

L450#845

Welcome to your dedicated webpage. From here you will be able to follow the progress of the delivery, track the  boat and receive updates from the captain and operations desk.

 

Downloads

Here you be able to download any relevant documents.

Notes

Here you will see updates on progress from the captain and our operations desk.


16th March 2020: Public places closing including marina. Visitors required to leave including crew whilst flights available. Delivery stopped


12th March 2020: In Cascais

  • Diver removed fishing line from prop
  • Engine service being done
  • Captain notes; the Genoa furling was installed the wrong way (see photos) so the UV strip was inside when furled. Now fixed. Halyard was also wrapped around the forestay making it difficult to furl. Now unwrapped.

08th March 2020; Captain reports

I’m on fuel dock Gijon. 40kts and 6-8m breaking seas trying to pass Gijon. Sleep is nice! Will fuel and leave am.


07th March 2020; Departed again


03rd March 2020: Now returning to port.

Captain reports 8m short seas.

Forecast is

WIND; In north, variable 3 or 4, becoming southwesterly 5 or 6 later. In south, cyclonic 7 to severe gale 9, becoming westerly or southwesterly 4 to 6.

SEA STATE; In north, rough. in south, rough or very rough.

WEATHER; In north, occasional rain. In south, rain at times.

VISIBILITY; In north, moderate or good. In south, good, occasionally poor.


03rd March 2020; They are departing Les sables


02nd March 2020; Captain reports;

CNB were still working on the boat on Friday fixing the anchor windlass. Could not leave before. Weather permitting, we will depart tomorrow.


 

23th February 2020: Captain on board


 


 


 


 


 

 

 

 

Gallery

Here you will see links to photo and videos of the delivery.





 


Translate »